Power Infrastructure, Built to Standard

We build the networks and substations that connect homes, farms, institutions and industry to power. Our work is carried out to IEC standards and ESCOM specifications, under our MERA Class A1 certification.

Voltage levels we work at

We design and build power infrastructure across Malawi at 0.23 kV, 0.4 kV, 11 kV, 33 kV and 66 kV. Our work covers:

  • Overhead lines, from wooden poles to steel towers
  • Underground cable networks
  • Associated equipment and switchgear, including transformers, circuit breakers, feeder pillars and metering

Substations and transformer installations

Our typical scope is a complete 33/0.4 kV or 11/0.4 kV distribution substation:

  • 33 kV or 11 kV pole structures and protection equipment
  • XLPE cable laying and termination
  • Transformer, metering and feeder-pillar plinths
  • Palisade fencing with dwarf wall and gate
  • Transformer installation, termination, testing and commissioning
  • Lightning protection and earthing to IEC 62305
  • LV armoured cable laying and termination
  • As-built documentation

Overhead lines (33 kV, 11 kV and 0.4 kV)

Pole hole excavation, pole erection and conductor stringing for medium- and low-voltage networks, including rural electrification works.

Underground cable

Medium- and low-voltage cable installation, with testing to IEC 60502 and ESCOM requirements.

How we work

We agree the scope in writing. Any change goes through a formal variation order. Responsibility for installed equipment passes to the client after successful testing and commissioning.

Discuss Your Power Infrastructure Project

Request a Quote