Zagaf Coal Mine Power Supply, North Rukuru, Karonga District
- Client: Zagaf Coal Mine
- Works: We installed and commissioned a 315 kVA ground-mounted distribution transformer to power the mine’s operations. The installation sits inside a palisade-fenced enclosure on a masonry dwarf wall, with a gravel-surfaced yard and LV cable connection.
MAREP Phase 9 (Lot 9) Overhead Line Construction, Likuchi and Mlala 2, Nkhotakota District
- Client: Ufulu Electrical Contractors Limited (main contractor)
- Scope: Construction of 33 kV and 0.4 kV overhead lines for the Malawi Rural Electrification Programme, covering 7.22 km: 1.94 km of 33 kV line and 5.28 km of 0.4 kV line.
- Works included: Pole hole excavation, pole erection and conductor stringing, in remote rural conditions.