MERA’s Net-Metering Rules let ESCOM customers who generate their own renewable electricity export surplus power to the grid and receive credit on their bill. Kwacha Energy is a MERA-certified Class A1 contractor. We can take you from eligibility check to commissioning, so your system is safe, compliant and approved the first time.

Who can apply

  • Residential, commercial, industrial, agricultural and mining customers of the distribution utility.
  • Renewable generation only, such as solar PV.
  • Systems of up to 500 kW (not exceeding 500 kVA or your main supply breaker rating).
  • Applicants with no outstanding bills, who own the premises or have the owner’s written permission.

How the credit works

  • You are billed as normal. Energy exported to the grid earns a credit that offsets the energy component of your bill.
  • The credit does not offset fixed or grid charges, and ESCOM does not pay cash for exports.
  • Unused credit rolls over to the next billing period.
  • Credit is not refunded if you vacate the premises or end the contract.

What we do for you

  1. Eligibility and sizing: We check your site, load and supply against the rules and recommend a system size.
  2. Application package: We prepare the site plan, single-line diagram and equipment details, and help with the standard application form and MERA private generation registration.
  3. Design for grid approval: The utility screens each application against network limits, including generation as a share of the line section’s peak load, fault current contribution and short-circuit ratings. We design to those criteria and support any additional review.
  4. Safe installation: Net-metered systems must be installed and maintained by certified electrical installers. We install the required visibly open, lockable, labelled disconnect switch and anti-islanding protection.
  5. Metering and commissioning: The utility supplies the bi-directional net meter at the customer’s cost. We carry out the commissioning test and support utility witnessing and inspection.
  6. Network works: Where the connection needs transformer, cable, switchgear or line works at 11 kV or 33 kV, we can build them.

What to expect

  • The utility acknowledges applications within 5 business days and aims to respond within 15 working days of receiving a complete one.
  • Connection fees and meter costs are paid by the applicant.
  • After approval, the utility may inspect the facility and requires an annual disconnection test.
  • Carbon credits are treated as belonging to the customer-generator.

The rules are new and ESCOM is at pilot stage. Contact us to discuss what applies to your site.